Hi Leo,
Thanks for document.
Quantity conversion is not possible as its is not fixed.
For e.g. some time we can do service for 200 bolts per day/shift but it is not fixed, it may differ
billing is based on quantity of bolts tighten / loosen.
In case if we maintain, billing would be wrong.
how to tackle this?
Rg.
Vishal